Folder PCA0002-1a
Container
Contains 60 Results:
AS 118: VSM work, took place in all sections of the pipeline. By early March, more than 50,000 of the 80,000 VSMs required were installed., 1976-03
Item — Folder: PCA0002-1a
Identifier: PCA0002-1a-32
Scope and Contents
PC1226-7
Dates:
Issued: 1976-03
AS 60: In most VSMs, special thermal devices or heat exchanger pipes are installed to maintain the permafrost in a stable condition around the supports., 1976-03
Item — Folder: PCA0002-1a
Identifier: PCA0002-1a-33
Scope and Contents
PC1211-8
Dates:
Issued: 1976-03
AS 60: Here at a heat pipe installation spread near Fairbanks, a technician checks the refrigerant in the heat pipe., 1976-03
Item — Folder: PCA0002-1a
Identifier: PCA0002-1a-34
Scope and Contents
PC1212-6
Dates:
Issued: 1976-03
AS 60: The anhydrous ammonia refrigerant transfers the heat from the soil to the radiator fins at the top of the heat pipe., 1976-03
Item — Folder: PCA0002-1a
Identifier: PCA0002-1a-35
Scope and Contents
PC1212-1
Dates:
Issued: 1976-03
AS 60: About 420 miles of the pipeline is being constructed above ground in areas of permafrost., 1976-03
Item — Folder: PCA0002-1a
Identifier: PCA0002-1a-36
Scope and Contents
PC1211-10
Dates:
Issued: 1976-03
Toolik Camp: The pipeline work force was about 8,000 in early March. Many of the pipeline camps were at capacity as the work activity resumed. This is Toolik Camp, about 130 miles south of Prudhoe Bay., 1976-03
Item — Folder: PCA0002-1a
Identifier: PCA0002-1a-37
Scope and Contents
CA711-7
Dates:
Issued: 1976-03
P. S. 4: The work force at the pump stations totaled just over 2,000. This is Pump Station 4, just north of the Brooks Mountain Range., 1976-03
Item — Folder: PCA0002-1a
Identifier: PCA0002-1a-38
Scope and Contents
PS317-7
Dates:
Issued: 1976-03
P. S. 3: Work progressed at all of the pump stations required for the operating capacity of the pipeline, which will be 1.2 million barrels of crude oil per day., 1976-03
Item — Folder: PCA0002-1a
Identifier: PCA0002-1a-39
Scope and Contents
PS222-13
Dates:
Issued: 1976-03
P. S. 1: The majority of the work at the stations was indoors and included progress on heating and ventilation systems; installation of valves; work on piping and pipe corridors; and completion of the buildings, themselves., 1976-03
Item — Folder: PCA0002-1a
Identifier: PCA0002-1a-40
Scope and Contents
PS150-17
Dates:
Issued: 1976-03
P. S. 3: In late February, progress on all the pump stations was reported at just under 30 per cent complete., 1976-03
Item — Folder: PCA0002-1a
Identifier: PCA0002-1a-41
Scope and Contents
PS223-18
Dates:
Issued: 1976-03