Skip to main content

AS 60: About 420 miles of the pipeline is being constructed above ground in areas of permafrost., 1976-03

 Item — Folder: PCA0002-1a
Identifier: PCA0002-1a-36

Scope and Contents

PC1211-10

Dates

  • Issued: 1976-03

Conditions Governing Access

The collection is available for viewing; however the images may not be photocopied.

Extent

1 Photographic Slides

Language of Materials

From the Collection: English

Repository Details

Part of the Alaska State Library - Historical Collections Finding Aids Repository

Contact:
PO Box 110571
Juneau AK 99811-0571 US
907-465-2920
907-465-2925
907-465-2151 (Fax)