P. S. 1: The majority of the work at the stations was indoors and included progress on heating and ventilation systems; installation of valves; work on piping and pipe corridors; and completion of the buildings, themselves., 1976-03
Item — Folder: PCA0002-1a
Identifier: PCA0002-1a-40
Scope and Contents
PS150-17
Dates
- Issued: 1976-03
Conditions Governing Access
The collection is available for viewing; however the images may not be photocopied.
Extent
1 Photographic Slides
Language of Materials
From the Collection: English
Repository Details
Part of the Alaska State Library - Historical Collections Finding Aids Repository
Contact:
PO Box 110571
Juneau AK 99811-0571 US
907-465-2920
907-465-2925
907-465-2151 (Fax)
asl.historical@alaska.gov
PO Box 110571
Juneau AK 99811-0571 US
907-465-2920
907-465-2925
907-465-2151 (Fax)
asl.historical@alaska.gov