Here, in Atigun Pass of the Brooks Mountain Range, frequent snowfall and subzero weather hampered work progress., 1976-11
Item — Folder: PCA0002-3b
Identifier: PCA0002-3b-31
Scope and Contents
PC3271-3272
Dates:
Issued: 1976-11
In addition to the cold, fall rains created quagmires along the right of way., 1976-11
Item — Folder: PCA0002-3b
Identifier: PCA0002-3b-32
Scope and Contents
PC2415-17
Dates:
Issued: 1976-11
A special construction method is being used for the pipeline installation through Atigun Pass., 1976-11
Item — Folder: PCA0002-3b
Identifier: PCA0002-3b-33
Scope and Contents
PC 2484-18
Dates:
Issued: 1976-11
Ice-rich permafrost soils in the area require that about 6,000 feet of the pipeline be sealed and buried in an insulated box., 1976-11
Item — Folder: PCA0002-3b
Identifier: PCA0002-3b-34
Scope and Contents
PC2420-2418
Dates:
Issued: 1976-11
Normal construction design would call for above-ground construction in the permafrost area, but danger of avalanches in the area required the pipe be buried., 1976-11
Item — Folder: PCA0002-3b
Identifier: PCA0002-3b-35
Scope and Contents
PC2483-14
Dates:
Issued: 1976-11
A concrete slab in the bottom of the pipe ditch provides a smooth working surface and is used to secure the insulation around the pipe., 1976-11
Item — Folder: PCA0002-3b
Identifier: PCA0002-3b-36
Scope and Contents
PC2423-11
Dates:
Issued: 1976-11
A cage fabricated of metal tubing and wire protects workers spreading the concrete from rocks falling from the side of the ditch., 1976-11
Item — Folder: PCA0002-3b
Identifier: PCA0002-3b-37
Scope and Contents
PC2414-3
Dates:
Issued: 1976-11
Insulation, 21 inches thick, is installed around the pipe., 1976-11
Item — Folder: PCA0002-3b
Identifier: PCA0002-3b-38
Scope and Contents
PC2411-2
Dates:
Issued: 1976-11
After the bottom and side panels have been placed, sheets of plywood are added to the outer surface to prevent damage to the insulation during the backfill process. A cement-bedding mixture is then added to fill the space between the pipe and insulation., 1976-11
Item — Folder: PCA0002-3b
Identifier: PCA0002-3b-39
Scope and Contents
PC2481-14
Dates:
Issued: 1976-11
All pipe welding had been completed in the pass by early November, with backfilling expected to be completed before year-end., 1976-11
Item — Folder: PCA0002-3b
Identifier: PCA0002-3b-40
Scope and Contents
PC2426-2
Dates:
Issued: 1976-11