Skip to main content

After the bottom and side panels have been placed, sheets of plywood are added to the outer surface to prevent damage to the insulation during the backfill process. A cement-bedding mixture is then added to fill the space between the pipe and insulation., 1976-11

 Item — Folder: PCA0002-3b
Identifier: PCA0002-3b-39

Scope and Contents

PC2481-14

Dates

  • Issued: 1976-11

Conditions Governing Access

The collection is available for viewing; however the images may not be photocopied.

Extent

1 Photographic Slides

Language of Materials

From the Collection: English

Repository Details

Part of the Alaska State Library - Historical Collections Finding Aids Repository

Contact:
PO Box 110571
Juneau AK 99811-0571 US
907-465-2920
907-465-2925
907-465-2151 (Fax)