This is a report of progress made on the trans Alaska pipeline through November, 1976., 1976-11
Item — Folder: PCA0002-3b
Identifier: PCA0002-3b-1
Scope and Contents
PC2509-8A
Dates:
Issued: 1976-11
By early November, the total project was 89 per cent complete., 1976-11
Item — Folder: PCA0002-3b
Identifier: PCA0002-3b-2
Scope and Contents
WI4004-11A
Dates:
Issued: 1976-11
More than 790 miles of the 800-mile pipeline were in place, and work continued on the facilities at the pump stations and terminal., 1976-11
Item — Folder: PCA0002-3b
Identifier: PCA0002-3b-3
Scope and Contents
PC2349/2350
Dates:
Issued: 1976-11
Pipeline installation was completed through Keystone Canyon, about 15 miles east of Valdez., 1976-11
Item — Folder: PCA0002-3b
Identifier: PCA0002-3b-4
Scope and Contents
PC2429-1A
Dates:
Issued: 1976-11
The pipeline was buried atop the east wall of the 4-mile long canyon., 1976-11
Item — Folder: PCA0002-3b
Identifier: PCA0002-3b-5
Scope and Contents
PC2345-13
Dates:
Issued: 1976-11
The Keystone section was the next-to-last task for the southern-most section—pipeline section 1—to complete., 1976-11
Item — Folder: PCA0002-3b
Identifier: PCA0002-3b-6
Scope and Contents
PC2393-1
Dates:
Issued: 1976-11
The last task, which was still under way in November, was a few miles north of Keystone where crews had to descend the rugged and steep south face of Thompson Pass., 1976-11
Item — Folder: PCA0002-3b
Identifier: PCA0002-3b-7
Scope and Contents
PC2430-19A
Dates:
Issued: 1976-11
There are three separate slopes down the descent of the face of the pass. Here, on the lower slope the going was not too bad., 1976-11
Item — Folder: PCA0002-3b
Identifier: PCA0002-3b-8
Scope and Contents
PC2397-12
Dates:
Issued: 1976-11
But the top and middle slopes were very steep, reaching grades of 47 degrees—or 120 per cent from horizontal., 1976-11
Item — Folder: PCA0002-3b
Identifier: PCA0002-3b-9
Scope and Contents
PC2402-18/12
Dates:
Issued: 1976-11
Dozers, known for their sure-footed ability, had to be cabled together to creep down the side of the mountain., 1976-11
Item — Folder: PCA0002-3b
Identifier: PCA0002-3b-10
Scope and Contents
PC2438-1
Dates:
Issued: 1976-11