Folder PCA0002-3a
Container
Contains 80 Results:
(61) Piping systems were being hydrotested as they were completed., 1976-09
Item — Folder: PCA0002-3a
Identifier: PCA0002-3a-61
Scope and Contents
PS4028-6
Dates:
Issued: 1976-09
(62) Other pump station work included concrete pours, installation of valves and setting of equipment., 1976-09
Item — Folder: PCA0002-3a
Identifier: PCA0002-3a-62
Scope and Contents
PS2037-17
Dates:
Issued: 1976-09
(63) This black bear was keeping tabs on progress at Pump Station 5, about 80 miles north of the Yukon River., 1976-09
Item — Folder: PCA0002-3a
Identifier: PCA0002-3a-63
Scope and Contents
PS4026-12
Dates:
Issued: 1976-09
(64) Electrical conduit, building partitions and exterior siding was being completed on station facilities., 1976-09
Item — Folder: PCA0002-3a
Identifier: PCA0002-3a-64
Scope and Contents
PS4024-13
Dates:
Issued: 1976-09
(65) Work is expected to continue during the winter months at the stations, which will include completion of the electrical and instrumentation work inside the buildings., 1976-09
Item — Folder: PCA0002-3a
Identifier: PCA0002-3a-65
Scope and Contents
PS5030-7
Dates:
Issued: 1976-09
(66) At the Valdez Terminal, work was about two-thirds complete in early September. Here, at the power plant and vapor recovery area, fuel tanks were hydrotested, power sources set in the electrical control building, and piping installed., 1976-09
Item — Folder: PCA0002-3a
Identifier: PCA0002-3a-66
Scope and Contents
VT6132-10
Dates:
Issued: 1976-09
(67) The four storage tanks in the West Tank Farm were erected and work was under way on the tanks internal fixtures., 1976-09
Item — Folder: PCA0002-3a
Identifier: PCA0002-3a-67
Scope and Contents
VT7049-1
Dates:
Issued: 1976-09
(68) In the East Tank Farm, 10 of the 14 tanks were hydrotested, 1976-09
Item — Folder: PCA0002-3a
Identifier: PCA0002-3a-68
Scope and Contents
VT7054-3
Dates:
Issued: 1976-09
(69) and work continued on the dike walls,, 1976-09
Item — Folder: PCA0002-3a
Identifier: PCA0002-3a-69
Scope and Contents
VT7052-13
Dates:
Issued: 1976-09
(70) reinforced earth wall, and containment areas in the tank farm., 1976-09
Item — Folder: PCA0002-3a
Identifier: PCA0002-3a-70
Scope and Contents
VT7052-18
Dates:
Issued: 1976-09