(66) At the Valdez Terminal, work was about two-thirds complete in early September. Here, at the power plant and vapor recovery area, fuel tanks were hydrotested, power sources set in the electrical control building, and piping installed., 1976-09
Item — Folder: PCA0002-3a
Identifier: PCA0002-3a-66
Scope and Contents
VT6132-10
Dates
- Issued: 1976-09
Conditions Governing Access
The collection is available for viewing; however the images may not be photocopied.
Extent
1 Photographic Slides
Language of Materials
From the Collection: English
Repository Details
Part of the Alaska State Library - Historical Collections Finding Aids Repository
Contact:
PO Box 110571
Juneau AK 99811-0571 US
907-465-2920
907-465-2925
907-465-2151 (Fax)
asl.historical@alaska.gov
PO Box 110571
Juneau AK 99811-0571 US
907-465-2920
907-465-2925
907-465-2151 (Fax)
asl.historical@alaska.gov