Folder PCA0002-2a
Container
Contains 79 Results:
The project’s workforce totaled an estimated 21,000 as of early July, including administrative and craft personnel on the pipeline, at the pump stations and at the Valdez terminal., 1976-07
Item — Folder: PCA0002-2a
Identifier: PCA0002-2a-78
Scope and Contents
VT249-6
Dates:
Issued: 1976-07
Other noteworthy developments during the reporting period included announcements by Alyeska Pipeline Service Company that the forecast cost of the pipeline had risen to $7.7 billion; that Mr. E.L. Patton was appointed Chairman and Chief Executive Officer and Dr. W. J. Darch was appointed president of Alyeska; and that Executive Vice President Charles Elder would leave the company in July., 1976-07
Item — Folder: PCA0002-2a
Identifier: PCA0002-2a-79
Scope and Contents
SC322-13A
Dates:
Issued: 1976-07
This is a report on the progress made on the trans Alaska pipeline project through July, 1976., 1976-07
Item — Folder: PCA0002-2a
Identifier: PCA0002-2a-1
Scope and Contents
PC433-3A
Dates:
Issued: 1976-07
The report covers activities that took place during May, when winter conditions still prevailed in the northern section of the pipeline route..., 1976-07
Item — Folder: PCA0002-2a
Identifier: PCA0002-2a-2
Scope and Contents
WI337-16
Dates:
Issued: 1976-07
…And during June, when summer conditions permitted short-sleeve work attire., 1976-07
Item — Folder: PCA0002-2a
Identifier: PCA0002-2a-3
Scope and Contents
PC6286-29
Dates:
Issued: 1976-07
Construction highlights during the period included erection of a cable suspension bridge for the pipeline crossing over the Tanana River., 1976-07
Item — Folder: PCA0002-2a
Identifier: PCA0002-2a-4
Scope and Contents
PC6269
Dates:
Issued: 1976-07
....And the erection of a boiler stack, the length of a football field, at the Valdez Terminal., 1976-07
Item — Folder: PCA0002-2a
Identifier: PCA0002-2a-5
Scope and Contents
VT6102-6111
Dates:
Issued: 1976-07
In early July, the total pipeline project was more than two-thirds complete., 1976-07
Item — Folder: PCA0002-2a
Identifier: PCA0002-2a-6
Scope and Contents
PC2252-7
Dates:
Issued: 1976-07
More than 530 miles of the 800-mile long pipeline was completed., 1976-07
Item — Folder: PCA0002-2a
Identifier: PCA0002-2a-7
Scope and Contents
PC2257-7
Dates:
Issued: 1976-07
About 235 of this total were installed above ground., 1976-07
Item — Folder: PCA0002-2a
Identifier: PCA0002-2a-8
Scope and Contents
PC1291-7
Dates:
Issued: 1976-07