Skip to main content

Construction highlights during the period included erection of a cable suspension bridge for the pipeline crossing over the Tanana River., 1976-07

 Item — Folder: PCA0002-2a
Identifier: PCA0002-2a-4

Scope and Contents

PC6269

Dates

  • Issued: 1976-07

Conditions Governing Access

The collection is available for viewing; however the images may not be photocopied.

Extent

1 Photographic Slides

Language of Materials

From the Collection: English

Repository Details

Part of the Alaska State Library - Historical Collections Finding Aids Repository

Contact:
PO Box 110571
Juneau AK 99811-0571 US
907-465-2920
907-465-2925
907-465-2151 (Fax)