Folder PCA0002-1b
Container
Contains 80 Results:
PS6: Substantial progress was reported at the pump stations required for the initial operation of the pipeline. Work continued on installation of interior components for the permanent facilities at the stations., 1976-05
Item — Folder: PCA0002-1b
Identifier: PCA0002-1b-61
Scope and Contents
PS524-8
Dates:
Issued: 1976-05
PS10: Here at pump station 10, work was under way on the crude oil topping plant., 1976-05
Item — Folder: PCA0002-1b
Identifier: PCA0002-1b-62
Scope and Contents
PS858-9
Dates:
Issued: 1976-05
PS10: The two largest components of the plant are the 43-foot high surge drum and the topping totter. The surge drum is being lifted and set here., 1976-05
Item — Folder: PCA0002-1b
Identifier: PCA0002-1b-63
Scope and Contents
PS860-5/4
Dates:
Issued: 1976-05
PS10: This crude heater and other components were installed for the plant., 1976-05
Item — Folder: PCA0002-1b
Identifier: PCA0002-1b-64
Scope and Contents
PS853-9
Dates:
Issued: 1976-05
PS10: The topping plant will be, in essence, a small refinery which draws crude from the pipeline and "refines" it into diesel fuel., 1976-05
Item — Folder: PCA0002-1b
Identifier: PCA0002-1b-65
Scope and Contents
PS855-18
Dates:
Issued: 1976-05
PS10: Similar plants are being constructed at stations 8 and 6, and the three plants will provide energy to power the turbines at the stations south of the Brooks Range., 1976-05
Item — Folder: PCA0002-1b
Identifier: PCA0002-1b-66
Scope and Contents
PS861-12
Dates:
Issued: 1976-05
PS5: At most of the stations, work was under way on the mainline pipe corridors., 1976-05
Item — Folder: PCA0002-1b
Identifier: PCA0002-1b-67
Scope and Contents
PS420-18
Dates:
Issued: 1976-05
PS3: Here at pump station 3, about 105 miles south of Prudhoe Bay, the mainline corridor was completed in late March., 1976-05
Item — Folder: PCA0002-1b
Identifier: PCA0002-1b-68
Scope and Contents
PS227-16
Dates:
Issued: 1976-05
PS3: The corridor at station 3 is technically refrigerated, as is the station forum-ration, itself. The vertical small diameter pipes are part of the refrigeration system., 1976-05
Item — Folder: PCA0002-1b
Identifier: PCA0002-1b-69
Scope and Contents
PS225-9
Dates:
Issued: 1976-05
PS3: Crude oil will enter and exit a station through the pipe corridor. Inside the station, 13,500 horsepower pumps will boost the crude oil on its way south., 1976-05
Item — Folder: PCA0002-1b
Identifier: PCA0002-1b-70
Scope and Contents
PS232-10
Dates:
Issued: 1976-05