PS6: Substantial progress was reported at the pump stations required for the initial operation of the pipeline. Work continued on installation of interior components for the permanent facilities at the stations., 1976-05
Item — Folder: PCA0002-1b
Identifier: PCA0002-1b-61
Scope and Contents
PS524-8