Terminal: Trestle jackets for Berth 5 arrived from Japan and were being set during February., 1976-03
Item — Folder: PCA0002-1a
Identifier: PCA0002-1a-52
Scope and Contents
VT511-4
Dates:
Issued: 1976-03
Terminal: This series of photographs shows the setting of one of the jackets., 1976-03
Item — Folder: PCA0002-1a
Identifier: PCA0002-1a-53
Scope and Contents
VT513-4
Dates:
Issued: 1976-03
Terminal: In addition to the berth activity, work at the terminal included progress in the Ballast Water Treatment Area where concrete was poured for equipment foundations in the oil recovery building, and piping and equipment was installed in the oil floatation building., 1976-03
Item — Folder: PCA0002-1a
Identifier: PCA0002-1a-54
Scope and Contents
VT512-11
Dates:
Issued: 1976-03
Terminal: Equipment foundations were also poured in the Power Generation and Vapor Recovery Area. The third boiler was set during February., 1976-03
Item — Folder: PCA0002-1a
Identifier: PCA0002-1a-55
Scope and Contents
VT510-16
Dates:
Issued: 1976-03
Terminal: Snow removal and disposal remained a continuous task during the month. Snow load build-up on tanks was examined and found to be well within limits. However, as a precaution, snow was being removed from the roof perimeters of the tanks. The effort, here, is on one of the ballast water receiving tanks., 1976-03
Item — Folder: PCA0002-1a
Identifier: PCA0002-1a-56
Scope and Contents
VT403-3
Dates:
Issued: 1976-03
Terminal: In the West Tank Farm, the concrete ringwall was completed for one of the tanks, and half completed on a second tank. Site preparation was under way for the other two tanks in the West Tank Farm., 1976-03
Item — Folder: PCA0002-1a
Identifier: PCA0002-1a-57
Scope and Contents
VT212-1
Dates:
Issued: 1976-03
Valdez: Two Japanese ships arrived during the month with the last of the steel required for the tanks at the terminal., 1976-03
Item — Folder: PCA0002-1a
Identifier: PCA0002-1a-58
Scope and Contents
VC302-3
Dates:
Issued: 1976-03
Frank Moolin: The pipeline project received added recognition during February, when the Senior Project Manager of the Pipeline portion of the project, Frank P. Moolin, Jr., was named "Construction's Man of the Year" by Engineering News-Record magazine., 1976-03
Item — Folder: PCA0002-1a
Identifier: PCA0002-1a-59
Scope and Contents
MS180-18
Dates:
Issued: 1976-03
Frank Moolin: Moolin directs the work of a 700-member management team which oversees the work of the pipeline's nearly 200 contractors including five execution contractors who employ more than 13,000 workers this year. This concludes the March progress report., 1976-03
Item — Folder: PCA0002-1a
Identifier: PCA0002-1a-60
Scope and Contents
MS 179-16
Dates:
Issued: 1976-03
[unidentified] [Aerial view of terminal, tanks, waterfront and mountains.], 1976-03