Terminal: In addition to the berth activity, work at the terminal included progress in the Ballast Water Treatment Area where concrete was poured for equipment foundations in the oil recovery building, and piping and equipment was installed in the oil floatation building., 1976-03

 Item — Folder: PCA0002-1a
Identifier: PCA0002-1a-54

Scope and Contents

VT512-11

Dates

  • Issued: 1976-03

Conditions Governing Access