Skip to main content

The eight stations required for the initial 1.2 million barrel per day operating capacity of the pipeline are scheduled to be completed in the late spring of 1977., 1976-11

 Item — Folder: PCA0002-3b
Identifier: PCA0002-3b-68

Scope and Contents

PS5036-20

Dates

  • Issued: 1976-11

Conditions Governing Access

The collection is available for viewing; however the images may not be photocopied.

Extent

1 Photographic Slides

Language of Materials

From the Collection: English

Repository Details

Part of the Alaska State Library - Historical Collections Finding Aids Repository

Contact:
PO Box 110571
Juneau AK 99811-0571 US
907-465-2920
907-465-2925
907-465-2151 (Fax)