Skip to main content

The longest river crossing on the route is across the Yukon River. Pipe is scheduled to be installed on the pipeway off the side of the highway bridge during August., 1976-07

 Item — Folder: PCA0002-2a
Identifier: PCA0002-2a-49

Scope and Contents

YB504-3

Dates

  • Issued: 1976-07

Conditions Governing Access

The collection is available for viewing; however the images may not be photocopied.

Extent

1 Photographic Slides

Language of Materials

From the Collection: English

Repository Details

Part of the Alaska State Library - Historical Collections Finding Aids Repository

Contact:
PO Box 110571
Juneau AK 99811-0571 US
907-465-2920
907-465-2925
907-465-2151 (Fax)