As is the Tanana bridge, the Tagline cable bridge is constructed to provide for pipe movement due to thermal expansion and other forces. The bridge is offset from the survey centerline and the sharp angles of the pipeline as it approaches and leaves the bridge accommodate this movement., 1976-07
Item — Folder: PCA0002-2a
Identifier: PCA0002-2a-47
Scope and Contents
PC6237-8
Dates
- Issued: 1976-07
Conditions Governing Access
The collection is available for viewing; however the images may not be photocopied.
Extent
1 Photographic Slides
Language of Materials
From the Collection: English
Repository Details
Part of the Alaska State Library - Historical Collections Finding Aids Repository
Contact:
PO Box 110571
Juneau AK 99811-0571 US
907-465-2920
907-465-2925
907-465-2151 (Fax)
asl.historical@alaska.gov
PO Box 110571
Juneau AK 99811-0571 US
907-465-2920
907-465-2925
907-465-2151 (Fax)
asl.historical@alaska.gov