Skip to main content

Piling installations on the bridge began in June 1975, and foundations were completed in the spring of 1976. Each two main cable anchors rests on 81 steel pilings driven to a depth of 68 feet., 1976-07

 Item — Folder: PCA0002-2a
Identifier: PCA0002-2a-37

Scope and Contents

PC6261-28

Dates

  • Issued: 1976-07

Conditions Governing Access

The collection is available for viewing; however the images may not be photocopied.

Extent

1 Photographic Slides

Language of Materials

From the Collection: English

Repository Details

Part of the Alaska State Library - Historical Collections Finding Aids Repository

Contact:
PO Box 110571
Juneau AK 99811-0571 US
907-465-2920
907-465-2925
907-465-2151 (Fax)