Folder PCA0002-4a
Container
Contains 80 Results:
Engineer Maurice Low checks out a control panel at Pump Station 4., 1977-01
Item — Folder: PCA0002-4a
Identifier: PCA0002-4a-51
Scope and Contents
PS3042-1
Dates:
Issued: 1977-01
Flour Superintendent Ed C. Smith traces the oil flow of Pump Stations 4’s control panel mimic flow diagram., 1977-01
Item — Folder: PCA0002-4a
Identifier: PCA0002-4a-52
Scope and Contents
PS3041-13
Dates:
Issued: 1977-01
Electricians at Pump Station 8 use a calibrating instrument to check out the control panel system. They are, from left, Kenneth Davis of San Francisco, Mark Feree of Anaheim, CA, ands Donald Dugagua of Kake, AK., 1977-01
Item — Folder: PCA0002-4a
Identifier: PCA0002-4a-53
Scope and Contents
PS6049-15
Dates:
Issued: 1977-01
Construction progress at the Valdez terminal was about 83 per cent at the end of 1976., 1977-01
Item — Folder: PCA0002-4a
Identifier: PCA0002-4a-54
Scope and Contents
VT6137-2
Dates:
Issued: 1977-01
At the terminal’s power plant/vapor recovery area, the major portion of the outside construction is complete., 1977-01
Item — Folder: PCA0002-4a
Identifier: PCA0002-4a-55
Scope and Contents
VT6141-8
Dates:
Issued: 1977-01
Control panels, electrical components and other instrumentation have been installed in the Facility., 1977-01
Item — Folder: PCA0002-4a
Identifier: PCA0002-4a-56
Scope and Contents
VT6150-7
Dates:
Issued: 1977-01
All major equipment and large diameter piping have been erected in the boiler and generator areas, and emphasis is being directed to the systems completion requirements for initial boiler commissioning., 1977-01
Item — Folder: PCA0002-4a
Identifier: PCA0002-4a-57
Scope and Contents
VT6147-2
Dates:
Issued: 1977-01
Three 12.5 megawatt, steam-driven turbine generators at the facility will produce electric power for the terminal., 1977-01
Item — Folder: PCA0002-4a
Identifier: PCA0002-4a-58
Scope and Contents
VT3049-7
Dates:
Issued: 1977-01
Components for the vapor recovery system will utilize flue gas from the power plant’s boilers, “scrub” it, compress it, and inject it into the crude oil storage tanks to prevent hydrocarbons from entering the atmosphere and to reduced the danger of fire in the tanks. [VT6136-1, # on slide], 1977-01
Item — Folder: PCA0002-4a
Identifier: PCA0002-4a-59
Scope and Contents
VT6136-1
Dates:
Issued: 1977-01
This view of the terminal was taken at night from the city of Valdez, which is across the port., 1977-01
Item — Folder: PCA0002-4a
Identifier: PCA0002-4a-60
Scope and Contents
VT3057-7
Dates:
Issued: 1977-01