Folder PCA0002-4a
Container
Contains 80 Results:
Pump station progress continued, with the five stations required for pipeline start-up expected to be completed in the first quarter of 1977. [PS7028-2, # on slide], 1977-01
Item — Folder: PCA0002-4a
Identifier: PCA0002-4a-41
Scope and Contents
PS7028-2
Dates:
Issued: 1977-01
The additional three stations required for the pipeline’s initial operating capacity of 1.2 million barrels per day are expected to be completed soon after., 1977-01
Item — Folder: PCA0002-4a
Identifier: PCA0002-4a-42
Scope and Contents
PS6052-16
Dates:
Issued: 1977-01
Exterior work was nearing completion at the pump stations,, 1977-01
Item — Folder: PCA0002-4a
Identifier: PCA0002-4a-43
Scope and Contents
PS8097-5
Dates:
Issued: 1977-01
and most of the work activity was concentrated indoors, consisting primarily of doing finishing work on the instrumentation and electrical systems., 1977-01
Item — Folder: PCA0002-4a
Identifier: PCA0002-4a-44
Scope and Contents
PS7027-6
Dates:
Issued: 1977-01
Following are some of the activities under way at the stations during the reporting period. Here, Harmon Wilson of Kansas City, Mo., lower, and Billy Sanders of Atlanta, work on the coupling of a 24-inch diameter line., 1977-01
Item — Folder: PCA0002-4a
Identifier: PCA0002-4a-45
Scope and Contents
PS7023-12
Dates:
Issued: 1977-01
Frank Lundy, of Hillsdale, New Jersey, examines the control panel of the heating system for Pump Station 4., 1977-01
Item — Folder: PCA0002-4a
Identifier: PCA0002-4a-46
Scope and Contents
PS3041-8
Dates:
Issued: 1977-01
Richard Chapman from Lambertville, Mich., checks the fitting on one of the halon bottles, part of Pump 4’s fire protection system., 1977-01
Item — Folder: PCA0002-4a
Identifier: PCA0002-4a-47
Scope and Contents
PS3041-18
Dates:
Issued: 1977-01
Electricians Jacques Pearce, left, of Atlanta, and Tom Gossard, Los Angeles, check the electrical components of a valve., 1977-01
Item — Folder: PCA0002-4a
Identifier: PCA0002-4a-48
Scope and Contents
PS3041-3
Dates:
Issued: 1977-01
Bill Hildebrand, of Atlanta, background, and Marvin Holland, of Burlington, West VA., terminate wires from the control panels., 1977-01
Item — Folder: PCA0002-4a
Identifier: PCA0002-4a-49
Scope and Contents
PS3042-5
Dates:
Issued: 1977-01
An electrician at Pump Station 9 checks the primary electrical switch gear, which is the primary power distribution system at the station., 1977-01
Item — Folder: PCA0002-4a
Identifier: PCA0002-4a-50
Scope and Contents
PS7024-6
Dates:
Issued: 1977-01