Folder PCA0002-4a
Container
Contains 80 Results:
The snow was trucked to the site where the pad was built and maintained. Pad construction took place at night, and the pipeline crews worked on the pad installing the line during the day., 1977-01
Item — Folder: PCA0002-4a
Identifier: PCA0002-4a-21
Scope and Contents
PC7184-3
Dates:
Issued: 1977-01
While all the 48-inch diameter pipeline is now in place, a number of tie-in welds remain to be completed before the pipeline is one continuous length. That will occur this spring when the final segment of pipe is hydrotested and the last tie-in weld is made., 1977-01
Item — Folder: PCA0002-4a
Identifier: PCA0002-4a-22
Scope and Contents
PC1422-17
Dates:
Issued: 1977-01
Insulation of the above ground pipeline continued during the early winter months., 1977-01
Item — Folder: PCA0002-4a
Identifier: PCA0002-4a-23
Scope and Contents
PC4042-17
Dates:
Issued: 1977-01
Installed by a specially-designed device called a manipulator, the insulation will keep the warm oil from getting too cold and sluggish should the system be shut down for a lengthy period during winter., 1977-01
Item — Folder: PCA0002-4a
Identifier: PCA0002-4a-24
Scope and Contents
PC4042-1
Dates:
Issued: 1977-01
Less than 40 miles of pipeline remain to be insulated during 1977. About 160 miles of pipeline remain to be hydrotested this year., 1977-01
Item — Folder: PCA0002-4a
Identifier: PCA0002-4a-25
Scope and Contents
PC4043-5
Dates:
Issued: 1977-01
This young bull moose was photographed just north of the Brooks Range, camped beneath an above ground section of the pipeline., 1977-01
Item — Folder: PCA0002-4a
Identifier: PCA0002-4a-26
Scope and Contents
WI5006-18
Dates:
Issued: 1977-01
With pipeline work almost completed, execution contractors MK-Rivers, Perini, PPCO, and Arctic constructors have completed work under their contract and have demobilized. Associated Greene has been awarded a contract to complete remaining construction along the 800 mile route pipeline., 1977-01
Item — Folder: PCA0002-4a
Identifier: PCA0002-4a-27
Scope and Contents
PC1409-13
Dates:
Issued: 1977-01
A total of 175 mainline valves—more per mile than any other pipeline, at pump stations and at the Valdez terminal., 1977-01
Item — Folder: PCA0002-4a
Identifier: PCA0002-4a-28
Scope and Contents
VA1009-14
Dates:
Issued: 1977-01
Sixty-two of the valves are remote gate valves, operated electronically from the operations control center at the Valdez terminal or from the closest pump station., 1977-01
Item — Folder: PCA0002-4a
Identifier: PCA0002-4a-29
Scope and Contents
PC1402-3
Dates:
Issued: 1977-01
The remote valves are operated by battery-powered electric motors housed in small buildings located along the pipeline right of way near the valve., 1977-01
Item — Folder: PCA0002-4a
Identifier: PCA0002-4a-30
Scope and Contents
VA1009-18
Dates:
Issued: 1977-01