Work progressed in both crude oil storage tank farms, including progress on the containment areas in the East Tank Farm and hydrotesting of tanks in the West Tank Farm., 1976-11
Item — Folder: PCA0002-3b
Identifier: PCA0002-3b-71
Scope and Contents
VT7057-1
Dates:
Issued: 1976-11
Heavy snowfall affected productivity of construction outdoors. Here, snow is being removed from the roof of one of the ballast water receiving tanks., 1976-11
Item — Folder: PCA0002-3b
Identifier: PCA0002-3b-72
Scope and Contents
VT4028-11
Dates:
Issued: 1976-11
Four mechanical loading arms were installed on Berth 4., 1976-11
Item — Folder: PCA0002-3b
Identifier: PCA0002-3b-73
Scope and Contents
VT5091-1
Dates:
Issued: 1976-11
The loading arms, made of mild steel pipe, will permit the loading of tankers without the use of flexible hoses., 1976-11
Item — Folder: PCA0002-3b
Identifier: PCA0002-3b-74
Scope and Contents
VT5087-19
Dates:
Issued: 1976-11
The arms, designed with swivel joints and counterweights, can be maneuvered into loading position on tankers either manually or hydraulically., 1976-11
Item — Folder: PCA0002-3b
Identifier: PCA0002-3b-75
Scope and Contents
VT5082-13
Dates:
Issued: 1976-11
On the three fixed berths, each 16-inch arm will handle 27,500 barrels of oil an hour. On the floating berth, each 12-inch arm will permit the loading of 20,000 barrels of oil an hour., 1976-11
Item — Folder: PCA0002-3b
Identifier: PCA0002-3b-76
Scope and Contents
VT5081-14
Dates:
Issued: 1976-11
In addition to the four loading arms, the operators building and the crane were installed on berth 4. On berth 5, work progressed on the piping; and on berth 3, trestle piers were being set., 1976-11
Item — Folder: PCA0002-3b
Identifier: PCA0002-3b-77
Scope and Contents
VT5104-2
Dates:
Issued: 1976-11
By early November, project manpower had decreased to 13,290 persons., 1976-11
Item — Folder: PCA0002-3b
Identifier: PCA0002-3b-78
Scope and Contents
VT5095-1
Dates:
Issued: 1976-11
A number of the pipeline construction camps were being closed down, as the construction phase of the trans Alaska pipeline neared completion., 1976-11
Item — Folder: PCA0002-3b
Identifier: PCA0002-3b-79
Scope and Contents
CA7015-4
Dates:
Issued: 1976-11
Alyeska Pipeline Service Company [view of portion of Pipeline], 1976-11
Item — Folder: PCA0002-3b
Identifier: PCA0002-3b-80
Scope and Contents
PC1367-7A
Dates:
Issued: 1976-11