Folder PCA0002-3b
Container
Contains 80 Results:
Here, a quality assurance technician verifies the location of a specific weld by taking some measurements to check against a computer print out., 1976-11
Item — Folder: PCA0002-3b
Identifier: PCA0002-3b-51
Scope and Contents
PC9072-12
Dates:
Issued: 1976-11
Similar to a human fingerprint, each individual weld has characteristics unique to itself. These weld “fingerprints” are stored in a computer and have been employed to help identify welds., 1976-11
Item — Folder: PCA0002-3b
Identifier: PCA0002-3b-52
Scope and Contents
PC9072-19
Dates:
Issued: 1976-11
By early November, more than 630 miles of the pipeline had been tested without failure., 1976-11
Item — Folder: PCA0002-3b
Identifier: PCA0002-3b-53
Scope and Contents
PC3038-3
Dates:
Issued: 1976-11
Of the 162 miles of pipe still to be tested, 126 miles are located in section 5., 1976-11
Item — Folder: PCA0002-3b
Identifier: PCA0002-3b-54
Scope and Contents
PC3059/3057
Dates:
Issued: 1976-11
All of the river crossings are now completed. This is the cable suspension bridge at the Tazlina River, about 110 miles north of Valdez., 1976-11
Item — Folder: PCA0002-3b
Identifier: PCA0002-3b-55
Scope and Contents
PC6364-13
Dates:
Issued: 1976-11
Revegetation programs were carried out during the early fall period, but much of this work remains to be accomplished next year. Some pipe insulation, hydrotesting, right-of-way revegetation and final cleanup will be carried over into the first half of 1977., 1976-11
Item — Folder: PCA0002-3b
Identifier: PCA0002-3b-56
Scope and Contents
ER1005-3
Dates:
Issued: 1976-11
During the period, progress was made on the construction of the pump stations. This is pump station one at Prudhoe Bay, where crude oil will begin its journey south through the trans Alaska pipeline, top-center., 1976-11
Item — Folder: PCA0002-3b
Identifier: PCA0002-3b-57
Scope and Contents
PS1088-8
Dates:
Issued: 1976-11
Total pump station construction was about 84 per cent complete in early November., 1976-11
Item — Folder: PCA0002-3b
Identifier: PCA0002-3b-58
Scope and Contents
PS5039-3
Dates:
Issued: 1976-11
Remaining exterior work was completed on the majority of facilities at the stations. Here, the crude oil topping unit at Pump Station 6, just south of the Yukon River, is being enclosed., 1976-11
Item — Folder: PCA0002-3b
Identifier: PCA0002-3b-59
Scope and Contents
PS6043-3
Dates:
Issued: 1976-11
Hydrotesting of piping was being conducted at the stations during the period., 1976-11
Item — Folder: PCA0002-3b
Identifier: PCA0002-3b-60
Scope and Contents
PS6045-5
Dates:
Issued: 1976-11