The 4,500-foot long segment plunges vertically from an elevation of about 2,800-feet above sea level at the top, to about 1,000-feet above sea level at the bottom., 1976-11
Item — Folder: PCA0002-3b
Identifier: PCA0002-3b-21
Scope and Contents
PC2495-2475
Dates:
Issued: 1976-11
Walking up the slope was extremely difficult, 1976-11
Item — Folder: PCA0002-3b
Identifier: PCA0002-3b-22
Scope and Contents
PC2476-2
Dates:
Issued: 1976-11
and many workers took advantage of the tramway., 1976-11
Item — Folder: PCA0002-3b
Identifier: PCA0002-3b-23
Scope and Contents
PC2476-2
Dates:
Issued: 1976-11
Work at the pass extended into the late hours of each day, as every effort was made to complete the job this year., 1976-11
Item — Folder: PCA0002-3b
Identifier: PCA0002-3b-24
Scope and Contents
PC2486-4
Dates:
Issued: 1976-11
Here, a joint of pipe is aligned on one of the steepest areas of the slope., 1976-11
Item — Folder: PCA0002-3b
Identifier: PCA0002-3b-25
Scope and Contents
PC2474-10
Dates:
Issued: 1976-11
This welding scene was repeated many times until the string of pipeline was completed at the top of the pass., 1976-11
Item — Folder: PCA0002-3b
Identifier: PCA0002-3b-26
Scope and Contents
PC2478-14
Dates:
Issued: 1976-11
The final tie-in weld was completed October 20., 1976-11
Item — Folder: PCA0002-3b
Identifier: PCA0002-3b-27
Scope and Contents
PC2517-2518
Dates:
Issued: 1976-11
There was jubilation among the welding crew after completion of the project., 1976-11
Item — Folder: PCA0002-3b
Identifier: PCA0002-3b-28
Scope and Contents
MS3020-1
Dates:
Issued: 1976-11
Remaining to be completed in November was the backfilling of the ditch. Because of the steep grade, a special mixture of concrete is being used to bury the pipeline., 1976-11
Item — Folder: PCA0002-3b
Identifier: PCA0002-3b-29
Scope and Contents
PC2492-7
Dates:
Issued: 1976-11
Weather was also an important factor at another difficult construction area farther north., 1976-11
Item — Folder: PCA0002-3b
Identifier: PCA0002-3b-30
Scope and Contents
PC2428-18A
Dates:
Issued: 1976-11