Folder PCA0002-1b
Container
Contains 80 Results:
AS54: Surveyors also verify the height of the cross beams on above ground supports for elevated sections of the-pipeline, 1976-05
Item — Folder: PCA0002-1b
Identifier: PCA0002-1b-41
Scope and Contents
PC1253-2
Dates:
Issued: 1976-05
AS21: Work resumed during the reporting period on installation of above-ground sections of the pipeline., 1976-05
Item — Folder: PCA0002-1b
Identifier: PCA0002-1b-42
Scope and Contents
PC1251-17
Dates:
Issued: 1976-05
AS119: Drills were active in all five pipeline sections., 1976-05
Item — Folder: PCA0002-1b
Identifier: PCA0002-1b-43
Scope and Contents
PC1241-9
Dates:
Issued: 1976-05
AS53A: More than 68,000 vertical support members (vsm's) were installed by early May., 1976-05
Item — Folder: PCA0002-1b
Identifier: PCA0002-1b-44
Scope and Contents
PC1261-9
Dates:
Issued: 1976-05
AS53A: Here, about 40 miles south of Fairbanks, an 18-inch diameter vsm is being grouted in place., 1976-05
Item — Folder: PCA0002-1b
Identifier: PCA0002-1b-45
Scope and Contents
PC1262-6
Dates:
Issued: 1976-05
AS54: A little more than 180 miles of above ground pipeline had been installed by the first of the month, 1976-05
Item — Folder: PCA0002-1b
Identifier: PCA0002-1b-46
Scope and Contents
PC1252-16
Dates:
Issued: 1976-05
AS51: Here, an installed section of the pipeline winds through Rosa Pass, about 55 miles south of Fairbanks., 1976-05
Item — Folder: PCA0002-1b
Identifier: PCA0002-1b-47
Scope and Contents
PC1254-4
Dates:
Issued: 1976-05
North Slope: To compensate for expansion of the pipe caused by the warm oil, and to permit movement from possible seismic disturbances or other forces, the above ground pipeline is built in a zigzag configuration that converts expansion into a sideways movement. The section of above ground pipeline shown here is just south of Prudhoe Bay., 1976-05
Item — Folder: PCA0002-1b
Identifier: PCA0002-1b-48
Scope and Contents
PC1268-3A
Dates:
Issued: 1976-05
AS51: Insulation of above ground sections of the line was under way during the reporting period. A little less than 50 miles of above ground pipe was insulated by the first of the month., 1976-05
Item — Folder: PCA0002-1b
Identifier: PCA0002-1b-49
Scope and Contents
PC1267-4
Dates:
Issued: 1976-05
AS82: Remote gate valves were also being installed during the reporting period., 1976-05
Item — Folder: PCA0002-1b
Identifier: PCA0002-1b-50
Scope and Contents
PC1266-14
Dates:
Issued: 1976-05