Chena River: Pipe floats, attached to the weighted mainline pipe, facilitated the dragging of the pipe through the ditch., 1976-03
Item — Folder: PCA0002-1a
Identifier: PCA0002-1a-12
Scope and Contents
PC6123-13
Dates:
Issued: 1976-03
Gulkana River: In Section 1, an above ground river crossing was under way at the Gulkana River. Charges are set here for the excavation work., 1976-03
Item — Folder: PCA0002-1a
Identifier: PCA0002-1a-13
Scope and Contents
PC6138-4
Dates:
Issued: 1976-03
Gulkana River: About 2,400 square feet of material is being removed on both banks where the bridge foundations will be built., 1976-03
Item — Folder: PCA0002-1a
Identifier: PCA0002-1a-14
Scope and Contents
PC6138-10
Dates:
Issued: 1976-03
Gulkana River: The piers for the bridge, made from 48-inch mainline pipe and 18-inch support pipe, were fabricated in Anchorage and trucked to the crossings., 1976-03
Item — Folder: PCA0002-1a
Identifier: PCA0002-1a-15
Scope and Contents
PC6138-18
Dates:
Issued: 1976-03
Model: This is a model of the 400-foot, tied arch bridge, which is a new design for pipeline crossings on the trans Alaska pipeline project., 1976-03
Item — Folder: PCA0002-1a
Identifier: PCA0002-1a-16
Scope and Contents
MC410-14
Dates:
Issued: 1976-03
Lowe River: A buried river crossing that was completed in Section 1, was here at the Lowe River, just north of Valdez., 1976-03
Item — Folder: PCA0002-1a
Identifier: PCA0002-1a-17
Scope and Contents
PC6131-7
Dates:
Issued: 1976-03
Lowe River: The length of the Lowe crossing is about 1,500 feet., 1976-03
Item — Folder: PCA0002-1a
Identifier: PCA0002-1a-18
Scope and Contents
PC6132-2
Dates:
Issued: 1976-03
Lowe River: More than 16 miles of pipe had been installed at river crossings by early March., 1976-03
Item — Folder: PCA0002-1a
Identifier: PCA0002-1a-19
Scope and Contents
PC6131-9
Dates:
Issued: 1976-03
Lowe River: There are 84 major river crossings on the project., 1976-03
Item — Folder: PCA0002-1a
Identifier: PCA0002-1a-20
Scope and Contents
PC6132-11
Dates:
Issued: 1976-03
Lowe River: All crossings are scheduled to be completed this year., 1976-03
Item — Folder: PCA0002-1a
Identifier: PCA0002-1a-21
Scope and Contents
PC6132-20
Dates:
Issued: 1976-03