Cost Breakdown. Russian Mission: $5,300.00 Materials; 4,266.00 Supplies; 5,151.00 Labor; 1,500.00 Construction Foremen; $16,217.00 Total Cost of Project. Pitka’s Point: $11,000.00 Materials – Supplies; 7,600.00 Labor; 2,272.00 Construction Foremen; $20,872.00 Total Cost of Project.
Item — Folder: PCA0365
Identifier: PCA0365-33
Scope and Contents
From the Collection:
The photographs show the construction of two schools, at Russian Mission and Pitkas Point (originally "Petkas Point), in the Yukon-Kuskokwim Delta during the 1970's. Also shown are some of the local residents. The photographer is unknown. No additional information is available on the project.
Dates
- circa 1973
Conditions Governing Access
The photos may be viewed. However they may not be photocopied.
Extent
1 items
Language of Materials
From the Collection: English
Repository Details
Part of the Alaska State Library - Historical Collections Finding Aids Repository
Contact:
PO Box 110571
Juneau AK 99811-0571 US
907-465-2920
907-465-2925
907-465-2151 (Fax)
asl.historical@alaska.gov
PO Box 110571
Juneau AK 99811-0571 US
907-465-2920
907-465-2925
907-465-2151 (Fax)
asl.historical@alaska.gov