Pump Station 5 personnel remove the first of three start up “pigs,” devices used to precede the crude oil front during initial operation of the trans Alaska pipeline system. The pig made the journey from Pump Station 1 to Pump Station 5, a distance of 275 miles, in 10 days. A second pig, launched yesterday (June 30) from Pump station 5, is now travelling through the four foot diameter pipeline to Pump Station 10. There, the third and final pig will be launched to lead the oil to its final destination at the Valdez terminal. Alyeska Pipeline Service Company 7/1/77., 1977-07-01
Item — Folder: PCA0002-6
Identifier: PCA0002-6-69
Scope and Contents
PS5-27566.
Dates
- 1977-07-01
Conditions Governing Access
The collection is available for viewing; however the images may not be photocopied.
Extent
1 Photographic Prints
Language of Materials
From the Collection: English
Repository Details
Part of the Alaska State Library - Historical Collections Finding Aids Repository
Contact:
PO Box 110571
Juneau AK 99811-0571 US
907-465-2920
907-465-2925
907-465-2151 (Fax)
asl.historical@alaska.gov
PO Box 110571
Juneau AK 99811-0571 US
907-465-2920
907-465-2925
907-465-2151 (Fax)
asl.historical@alaska.gov