Here, at the pump station 2 location, and at other stations not required for the 1.2 million barrel capacity of the pipeline, all remained quiet. These “pass through” stations, partially completed last fall, do not have facilities or pumping capabilities. They may be completed as working pump stations if at a future date the pipeline capacity is increased above the 1.2 million barrels per day., 1977-04
Item — Folder: PCA0002-4b
Identifier: PCA0002-4b-47
Scope and Contents
PS2063-15
Dates
- Issued: 1977-04
Conditions Governing Access
The collection is available for viewing; however the images may not be photocopied.
Extent
1 Photographic Slides
Language of Materials
From the Collection: English
Repository Details
Part of the Alaska State Library - Historical Collections Finding Aids Repository
Contact:
PO Box 110571
Juneau AK 99811-0571 US
907-465-2920
907-465-2925
907-465-2151 (Fax)
asl.historical@alaska.gov
PO Box 110571
Juneau AK 99811-0571 US
907-465-2920
907-465-2925
907-465-2151 (Fax)
asl.historical@alaska.gov