Here, at the pump station 2 location, and at other stations not required for the 1.2 million barrel capacity of the pipeline, all remained quiet. These “pass through” stations, partially completed last fall, do not have facilities or pumping capabilities. They may be completed as working pump stations if at a future date the pipeline capacity is increased above the 1.2 million barrels per day., 1977-04

 Item — Folder: PCA0002-4b
Identifier: PCA0002-4b-47

Scope and Contents

PS2063-15

Dates

  • Issued: 1977-04