Skip to main content

Each pump station has three turbines, required for the 1.2 million barrel-per-day capacity of the pipeline. Two turbines will operate, and the third will be on standby., 1977-04

 Item — Folder: PCA0002-4b
Identifier: PCA0002-4b-43

Scope and Contents

PS6060-13

Dates

  • Issued: 1977-04

Conditions Governing Access

The collection is available for viewing; however the images may not be photocopied.

Extent

1 Photographic Slides

Language of Materials

From the Collection: English

Repository Details

Part of the Alaska State Library - Historical Collections Finding Aids Repository

Contact:
PO Box 110571
Juneau AK 99811-0571 US
907-465-2920
907-465-2925
907-465-2151 (Fax)