Skip to main content

The remaining 422 miles are above ground. The last of the above ground pipe installation was completed in the northern section of the pipeline in early December., 1977-01

 Item — Folder: PCA0002-4a
Identifier: PCA0002-4a-16

Scope and Contents

PC1412-16

Dates

  • Issued: 1977-01

Conditions Governing Access

The collection is available for viewing; however the images may not be photocopied.

Extent

1 Photographic Slides

Language of Materials

From the Collection: English

Repository Details

Part of the Alaska State Library - Historical Collections Finding Aids Repository

Contact:
PO Box 110571
Juneau AK 99811-0571 US
907-465-2920
907-465-2925
907-465-2151 (Fax)