Skip to main content

For more than a mile through this remote pass, avalanche dangers and unstable soil conditions required special construction techniques to be used. About 6, 000 feet of the ditch was lined with a concrete base, and the pipe encased in an insulation box to keep the soil frozen when hot oil enters the line., 1977-01

 Item — Folder: PCA0002-4a
Identifier: PCA0002-4a-11

Scope and Contents

PC2531-12

Dates

  • Issued: 1977-01

Conditions Governing Access

The collection is available for viewing; however the images may not be photocopied.

Extent

1 Photographic Slides

Language of Materials

From the Collection: English

Repository Details

Part of the Alaska State Library - Historical Collections Finding Aids Repository

Contact:
PO Box 110571
Juneau AK 99811-0571 US
907-465-2920
907-465-2925
907-465-2151 (Fax)