Skip to main content

(79) Work on the terminal, pump stations and pipeline progressed significantly during the summer months of 1976, as the project remains on schedule to be operational in mid-1977., 1976-09

 Item — Folder: PCA0002-3a
Identifier: PCA0002-3a-79

Scope and Contents

EQ3013-13

Dates

  • Issued: 1976-09

Conditions Governing Access

The collection is available for viewing; however the images may not be photocopied.

Extent

1 Photographic Slides

Language of Materials

From the Collection: English

Repository Details

Part of the Alaska State Library - Historical Collections Finding Aids Repository

Contact:
PO Box 110571
Juneau AK 99811-0571 US
907-465-2920
907-465-2925
907-465-2151 (Fax)