Skip to main content

(51) Pump Stations along the pipeline were about 70 per cent complete in early September., 1976-09

 Item — Folder: PCA0002-3a
Identifier: PCA0002-3a-51

Scope and Contents

PS5026-20

Dates

  • Issued: 1976-09

Conditions Governing Access

The collection is available for viewing; however the images may not be photocopied.

Extent

1 Photographic Slides

Language of Materials

From the Collection: English

Repository Details

Part of the Alaska State Library - Historical Collections Finding Aids Repository

Contact:
PO Box 110571
Juneau AK 99811-0571 US
907-465-2920
907-465-2925
907-465-2151 (Fax)