Terminal: Concrete floor slabs and support steel were added to the facilities in the power generation and vapor recovery area. Equipment installation included setting the fourth compressor in the compressor building, and setting the second and third cold condensate pumps, the upper shell on the second turbine and installing generator covers in the generator area., 1976-05