Terminal: Concrete floor slabs and support steel were added to the facilities in the power generation and vapor recovery area. Equipment installation included setting the fourth compressor in the compressor building, and setting the second and third cold condensate pumps, the upper shell on the second turbine and installing generator covers in the generator area., 1976-05
Item — Folder: PCA0002-1b
Identifier: PCA0002-1b-78
Scope and Contents
VT665-17
Dates
- Issued: 1976-05
Conditions Governing Access
The collection is available for viewing; however the images may not be photocopied.
Extent
1 Photographic Slides
Language of Materials
From the Collection: English
Repository Details
Part of the Alaska State Library - Historical Collections Finding Aids Repository
Contact:
PO Box 110571
Juneau AK 99811-0571 US
907-465-2920
907-465-2925
907-465-2151 (Fax)
asl.historical@alaska.gov
PO Box 110571
Juneau AK 99811-0571 US
907-465-2920
907-465-2925
907-465-2151 (Fax)
asl.historical@alaska.gov