Skip to main content

PS2: Preparation for corridor work also began at the four stations, known as "pass through" stations, not required until the pipeline capacity is increased above the 1.2 million barrel initial daily operation capacity. This is station 2., 1976-05

 Item — Folder: PCA0002-1b
Identifier: PCA0002-1b-72

Scope and Contents

PS233-4A

Dates

  • Issued: 1976-05

Conditions Governing Access

The collection is available for viewing; however the images may not be photocopied.

Extent

1 Photographic Slides

Language of Materials

From the Collection: English

Repository Details

Part of the Alaska State Library - Historical Collections Finding Aids Repository

Contact:
PO Box 110571
Juneau AK 99811-0571 US
907-465-2920
907-465-2925
907-465-2151 (Fax)