AS116: More than 80 miles of the 10-inch and 8-inch diameter line had been welded by early May. The line will supply power to the pump stations north of the Brooks Range. The Toolik pipeline construction camp is in the background, here., 1976-05
Item — Folder: PCA0002-1b
Identifier: PCA0002-1b-39
Scope and Contents
CL318-11
Dates
- Issued: 1976-05
Conditions Governing Access
The collection is available for viewing; however the images may not be photocopied.