Skip to main content

AS116: More than 80 miles of the 10-inch and 8-inch diameter line had been welded by early May. The line will supply power to the pump stations north of the Brooks Range. The Toolik pipeline construction camp is in the background, here., 1976-05

 Item — Folder: PCA0002-1b
Identifier: PCA0002-1b-39

Scope and Contents

CL318-11

Dates

  • Issued: 1976-05

Conditions Governing Access

The collection is available for viewing; however the images may not be photocopied.

Extent

1 Photographic Slides

Language of Materials

From the Collection: English

Repository Details

Part of the Alaska State Library - Historical Collections Finding Aids Repository

Contact:
PO Box 110571
Juneau AK 99811-0571 US
907-465-2920
907-465-2925
907-465-2151 (Fax)