Skip to main content

AS116: After the fuel line has been welded and x-rayed, "jeeping" or checks for irregularities in the pipe coating is performed, and breaks in the coating are patched., 1976-05

 Item — Folder: PCA0002-1b
Identifier: PCA0002-1b-38

Scope and Contents

GL320-3/10

Dates

  • Issued: 1976-05

Conditions Governing Access

The collection is available for viewing; however the images may not be photocopied.

Extent

1 Photographic Slides

Language of Materials

From the Collection: English

Repository Details

Part of the Alaska State Library - Historical Collections Finding Aids Repository

Contact:
PO Box 110571
Juneau AK 99811-0571 US
907-465-2920
907-465-2925
907-465-2151 (Fax)