Skip to main content

AS119: Other portions of the small diameter pipeline are being built alongside the pipeline haul road on a snowpad. Here, a homemade snow blade rig pulled by a tractor compacts the snow for the heavy equipment used on the fuel line project., 1976-05

 Item — Folder: PCA0002-1b
Identifier: PCA0002-1b-36

Scope and Contents

GL328-11

Dates

  • Issued: 1976-05

Conditions Governing Access

The collection is available for viewing; however the images may not be photocopied.

Extent

1 Photographic Slides

Language of Materials

From the Collection: English

Repository Details

Part of the Alaska State Library - Historical Collections Finding Aids Repository

Contact:
PO Box 110571
Juneau AK 99811-0571 US
907-465-2920
907-465-2925
907-465-2151 (Fax)