Skip to main content

AS99: More than 425 miles of pipeline were installed by early May. 230 miles of this total were buried line. Here the line is being taped and lowered into a ditch south of the Brooks Range., 1976-05

 Item — Folder: PCA0002-1b
Identifier: PCA0002-1b-26

Scope and Contents

PC2212-16

Dates

  • Issued: 1976-05

Conditions Governing Access

The collection is available for viewing; however the images may not be photocopied.

Extent

1 Photographic Slides

Language of Materials

From the Collection: English

Repository Details

Part of the Alaska State Library - Historical Collections Finding Aids Repository

Contact:
PO Box 110571
Juneau AK 99811-0571 US
907-465-2920
907-465-2925
907-465-2151 (Fax)