Delta River: By early May, more than 26 miles of pipeline had been installed at river crossings along the 800 mile route. The work here is on the delta river floodplain, about 215 miles north of Valdez., 1976-05
Item — Folder: PCA0002-1b
Identifier: PCA0002-1b-25
Scope and Contents
PC2211-3A
Dates
- Issued: 1976-05
Conditions Governing Access
The collection is available for viewing; however the images may not be photocopied.
Extent
1 Photographic Slides
Language of Materials
From the Collection: English
Repository Details
Part of the Alaska State Library - Historical Collections Finding Aids Repository
Contact:
PO Box 110571
Juneau AK 99811-0571 US
907-465-2920
907-465-2925
907-465-2151 (Fax)
asl.historical@alaska.gov
PO Box 110571
Juneau AK 99811-0571 US
907-465-2920
907-465-2925
907-465-2151 (Fax)
asl.historical@alaska.gov