Skip to main content

Gulkana River: The decision to abandon the buried concept because of construction difficulties was made last October, and the pipeline builders were given the challenge to design, construct and complete a bridge crossing before may, 1976 (after which date, river construction activity could damage fish habitat)., 1976-05

 Item — Folder: PCA0002-1b
Identifier: PCA0002-1b-11

Scope and Contents

PC6188-9

Dates

  • Issued: 1976-05

Conditions Governing Access

The collection is available for viewing; however the images may not be photocopied.

Extent

1 Photographic Slides

Language of Materials

From the Collection: English

Repository Details

Part of the Alaska State Library - Historical Collections Finding Aids Repository

Contact:
PO Box 110571
Juneau AK 99811-0571 US
907-465-2920
907-465-2925
907-465-2151 (Fax)