Box PCA0119
Contains 355 Results:
Jack McConnell Asst. Foreman of Dam Construction [standing on top of dam)
(no. 142)
Salmon Creek 9/25/13 [Tramway and flume in view]
(no. 141)
Salmon Creek 7-12-13 [Flume construction, mountains in background]
Winter and Pond S.11
Upper Floor Experimental Mill. Sheep Creek Division. 7-3-13 [Interior view showing equipment]
(C.11)
Salmon Creek. Power turned on Jan. 25. 1-26-13 [Interior view of powerhouse showing equipment]
Alaska Gastineau Mining Co. at Thane, including the Thane Milling Plant, Salmon Creek and Annex Creek power plant views, and plans and design drawings. Photographers represented in the collection include Winter & Pond and Serrott (?). Photographers’ numbers, if printed on the photograph, are included in parentheses in the inventory.
Salmon Creek. [Interior view showing equipment] 1-26-13.
Alaska Gastineau Mining Co. at Thane, including the Thane Milling Plant, Salmon Creek and Annex Creek power plant views, and plans and design drawings. Photographers represented in the collection include Winter & Pond and Serrott (?). Photographers’ numbers, if printed on the photograph, are included in parentheses in the inventory.
Salmon Creek 7-12-13. [Tramway construction]
(S.12)
Salmon Creek. 7-12-13. [Tramway construction]
Winter and Pond S.13
Salmon Creek. 7-12-13. [flume construction, buildings in foreground]
Winter and Pond S.9
Salmon Creek 7-12-13. [Powerhouse, flume and tramway in view]
Winter and Pond S.10