Box PCA0522
Container
Contains 95 Results:
The pylon structure with stayed cables visible used to support the main columns of the William Moore Bridge., 1977-04
Item — Box: PCA0522
Identifier: PCA0522-31
Scope and Contents
Image taken April 1977
Dates:
1977-04
Central Construction’s air track drill buried in snow., 1977-04
Item — Box: PCA0522
Identifier: PCA0522-32
Scope and Contents
Image taken April 1977
Dates:
1977-04
A view of the WP&YRR from the road grade., 1977-04
Item — Box: PCA0522
Identifier: PCA0522-33
Scope and Contents
Image taken April 1977
Dates:
1977-04
The road grade is visible after contractor snow plowing and melting., 1977-04
Item — Box: PCA0522
Identifier: PCA0522-34
Scope and Contents
Image taken April 1977
Dates:
1977-04
A view of the WP&YRR from the road grade., 1977-05
Item — Box: PCA0522
Identifier: PCA0522-35
Scope and Contents
Image taken May 1977
Dates:
1977-05
ADOT surveyor, Harold Medalen of Petersburg, on the road grade., 1977-05
Item — Box: PCA0522
Identifier: PCA0522-36
Scope and Contents
Image taken May 1977
Dates:
1977-05
A panoramic view of the William Moore Bridge (lower left of the image)., 1977-05
Item — Box: PCA0522
Identifier: PCA0522-37
Scope and Contents
Image taken May 1977
Dates:
1977-05
Contractor’s operating engineer performing snow plowing with a D-8 Cat., 1977-05
Item — Box: PCA0522
Identifier: PCA0522-38
Scope and Contents
Image taken May 1977
Dates:
1977-05
ADOT surveyors blessing the road prior to setting up road alignment stationing hubs., 1977-05
Item — Box: PCA0522
Identifier: PCA0522-39
Scope and Contents
Image taken May 1977
Dates:
1977-05
Contractor’s air track drill resting on a very steep slope to correct improper pre-shear blasting vertical wall slopes., 1977-05
Item — Box: PCA0522
Identifier: PCA0522-40
Scope and Contents
Image taken May 1977
Dates:
1977-05